BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//JCT Consultancy - ECPv6.15.7//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:JCT Consultancy
X-ORIGINAL-URL:https://jctconsultancy.co.uk
X-WR-CALDESC:Events for JCT Consultancy
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20260329T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261025T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20270328T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20271031T010000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:+0000
TZOFFSETTO:+0100
TZNAME:BST
DTSTART:20280326T010000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:+0100
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20281029T010000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;VALUE=DATE:20270615
DTEND;VALUE=DATE:20270618
DTSTAMP:20260817T204240
CREATED:20260817T105617Z
LAST-MODIFIED:20260817T105617Z
UID:10000042-1813017600-1813276799@jctconsultancy.co.uk
SUMMARY:Practical Application of MOVA Computer Workshop including the use of MOVA Tools and MOVA Simulation
DESCRIPTION:This course is designed for Traffic Signal Professionals involved in the design of Traffic Signal Installations which use Microprocessor Optimised Vehicle Actuation (MOVA) to optimise traffic signal timings. The course begins with basic theory of MOVA but moves quickly onto the practical application of MOVA including specifying detectors\, building Datasets and using MOVA Tools and MOVA Simulation on laptops which are supplied. Configuring MOVA outstations and integrating MOVA with SCOOT are also covered. The course has a lectured format with workshops to consolidate the learning and comprehensive notes and training materials are provided. \nWho should attend. \nAttendees should have a good basic understanding of UK traffic signals including Phases\, Stages\, Intergreens and Interstages. These topics are covered on other JCT courses such as “An Introduction to Traffic Signals”. Whilst it is not imperative to have extensive site experience attendees should have at least a very basic understanding of the components of a Traffic Signal Installation including the structure of Controllers\, Detector Loops and Out Station Transmission Units. \n  \nPrerequisites. \nUnderstanding of UK Phases\, Stages\, Intergreens and Interstages\, basic understanding of Traffic Signal Installations \n  \nCourse content. \nThe following topics are covered: \nIntroduction to MOVA: Basic theory of MOVA operation\, Benefits of MOVA\, Estimating MOVA modelling the benefits \nMOVA Design: Types of MOVA detectors\, locations and uses\, Alternatives to loops for MOVA detectors\, Options for right turn control under MOVA\, Staging a junction for MOVA \nController Specification: Writing relevant pages of ITS1827 to specify MOVA interface including UTC Interface\,  Phase Confirms and Detectors\, Special Conditions \nWorkshop Exercises – Design and Specification: Setting out of detectors on a plan\, considering road speeds and how to control right turns. Creating appropriate stages\, a stage order and specify the MOVA Interface. \nStructure of a MOVA Dataset: Explanation of the basic structure of a MOVA dataset\, consisting of links\, lanes\, detectors and stages\, and the definition of each. \nMOVA Tools: Working through MOVA Tools\, looking at the structure and parameters for Controllers\, Signals\, Matrices\, Links\, Lanes\, Detectors\, SD Codes \nWorkshop Exercises – Dataset: Writing the relevant controller specification forms and configuring a MOVA Dataset using MOVA Tools and MOVA Simulation for the site designed in the prior workshop. \nMOVA Versions and Hardware: Versions and facilities\,  Integral platforms\, Non-integral Outstations \nCommunicate and Configure MOVA Outstations: Connecting and communicating\, Basic configurations\, Uploading and downloading datasets \nIntegrating MOVA with SCOOT: Configuring and controlling MOVA on a SCOOT Site\, using UG405 and basic commands. \nValidating MOVA Operation: Principles of why and how MOVA is validated\, understanding: Troubleshooting common errors and problems\, Key validation parameters and what to check\, Signs of a well-configured MOVA installation
URL:https://jctconsultancy.co.uk/course/practical-application-of-mova-computer-workshop-including-the-use-of-mova-tools-and-mova-simulation-15-06-2027
LOCATION:Birmingham – Conference Aston\, Conference Centre & Hotel\, Aston Street\, Aston University Campus\, Birmingham\, West Midlands\, B4 7ET\, United Kingdom
CATEGORIES:In-Person Courses,Public Courses
ATTACH;FMTTYPE=image/png:https://jctconsultancy.co.uk/wp-content/uploads/2026/05/MOVA-3-Days.png
END:VEVENT
END:VCALENDAR