Who should attend.
Attendees should have a good basic understanding of UK traffic signals including Phases, Stages, Intergreens and Interstages. These topics are covered on other JCT courses such as "An Introduction to Traffic Signals". Whilst it is not imperative to have extensive site experience attendees should have at least a very basic understanding of the components of a Traffic Signal Installation including the structure of Controllers, Detector Loops and Out Station Transmission Units.
Prerequisites.
Understanding of UK Phases, Stages, Intergreens and Interstages, basic understanding of Traffic Signal Installations
Course content.
The following topics are covered:
Introduction to MOVA: Basic theory of MOVA operation, Benefits of MOVA, Estimating MOVA modelling the benefits
MOVA Design: Types of MOVA detectors, locations and uses, Alternatives to loops for MOVA detectors, Options for right turn control under MOVA, Staging a junction for MOVA
Controller Specification: Writing relevant pages of ITS1827 to specify MOVA interface including UTC Interface, Phase Confirms and Detectors, Special Conditions
Workshop Exercises – Design and Specification: Setting out of detectors on a plan, considering road speeds and how to control right turns. Creating appropriate stages, a stage order and specify the MOVA Interface.
Structure of a MOVA Dataset: Explanation of the basic structure of a MOVA dataset, consisting of links, lanes, detectors and stages, and the definition of each.
MOVA Tools: Working through MOVA Tools, looking at the structure and parameters for Controllers, Signals, Matrices, Links, Lanes, Detectors, SD Codes
Workshop Exercises - Dataset: Writing the relevant controller specification forms and configuring a MOVA Dataset using MOVA Tools and MOVA Simulation for the site designed in the prior workshop.
MOVA Versions and Hardware: Versions and facilities, Integral platforms, Non-integral Outstations
Communicate and Configure MOVA Outstations: Connecting and communicating, Basic configurations, Uploading and downloading datasets
Integrating MOVA with SCOOT: Configuring and controlling MOVA on a SCOOT Site, using UG405 and basic commands.
Validating MOVA Operation: Principles of why and how MOVA is validated, understanding: Troubleshooting common errors and problems, Key validation parameters and what to check, Signs of a well
Accreditation.
is empty.
21 Jan 2025: Online Introduction To Traffic Signals ...more
11 Mar 2025: LinSig3 : Online Junction Modelling Computer Workshop ...more
20 May 2025: Introduction to Traffic Signals ...more
20 May 2025: Practical Application of MOVA Computer Workshop including the use of MOVA Tools and MOVA Simulation ...more
22 May 2025: LinSig3 : Junction Modelling Computer Workshop ...more
To subscribe to Course, Software or Symposium update emails, please click here